
Project
Sealink Sulthan Battery
Mangalore Smart City Limited
Completion Date: In Progress





Construction approach ramps to the road bridge sulthan battery on EPC mode works
The project involves constructing approach ramps leading to the road bridge at Sulthan Battery under the EPC mode. These ramps are designed to provide smooth and safe connectivity to the main bridge structure. The work includes earthwork, structural components, pavement layers, and necessary drainage provisions. The project aims to improve accessibility, enhance traffic flow, and ensure seamless integration with the existing road network.
Construction of road bridge across river gurupura at sulthan Battery on Engineering procument & construction (EPC) mode works
This project involves the construction of a new road bridge across the Gurupura River at Sulthan Battery. The work is being executed under the Engineering, Procurement and Construction (EPC) mode, ensuring streamlined planning, design, and execution by a single agency. The bridge aims to improve connectivity, reduce travel time, and enhance transportation efficiency in the region. Once completed, it will serve as a vital link supporting local mobility and regional development.